News

Serac Breaks Ground on Its Future Industrial Site (France)

On July 24, 2026, Serac broke ground on its future industrial site in La Ferté-Bernard (Sarthe).

On July 24, 2026, Serac broke ground on its future industrial site in La Ferté-Bernard (France). Designed and built from start to finish by GSE’s teams, this 16,620 m² next-generation facility located on a 7.6-hectare site within the Eguillon Industrial Zone will bring together under one roof a number of the group’s operations that are currently scattered across various locations. This strategic investment firmly anchors Serac in its home region, supporting a growth strategy that is resolutely focused on international expansion while also driving job creation. Completion is scheduled for late 2027.

 

Serac, a family-owned business that has grown into an international group with more than 800 employees, has been designing and manufacturing filling and capping machines for food and non-food products for over fifty years.

Long housed in three separate buildings on Route de Mamers in La Ferté-Bernard, the group will be moving out of two of the three buildings and relocating to Rue George Charpak, also in La Ferté-Bernard.

This decision reflects the group’s commitment to bringing all of its business units together under one roof. The 7.6 hectare site, located in the heart of the Eguillon business park, benefits from excellent transportation links, including proximity to the A11 highway.

This project, which responds to Serac’s sustained growth, will support the group’s increase in production capacity, resulting in the creation of approximately 50 jobs. By choosing to expand locally, Serac reaffirms its commitment to the region the Pays de l’Huisne Sarthoise and the Perche Émeraude Community of Municipalities from which it draws its expertise and industrial know-how.

 

Some figures

16 620

Total building area in m²

7,6

Land area in hectares

50+

Creation of about 50 jobs

A factory, offices but that’s not all

To precisely meet Serac’s specifications, GSE designed starting from scratch a custom-built 16,620 m² facility combining a commercial area of approximately 3,550 m², a large assembly workshop of about 8,500 m², a storage warehouse (2,100 m²), a shipping area (600 m²), and associated technical facilities (390 m²), plus a company cafeteria of approximately 400 m². The project also includes a logistics yard with dedicated heavy-duty vehicle access and a 310 space parking lot. A unique site, designed to meet all of Serac’s needs from production and logistics to management and quality of life at work.

The building combines technical rigor with architectural vision and benefits from digital monitoring throughout its design process thanks to the BIM model.*

*A BIM model is a digital, data-rich 3D representation of a building or infrastructure asset, used to plan, design, construct, and manage it throughout its lifecycle, integrating multidisciplinary information in a single intelligent model.

 

“ With the launch of this project, we are reaching a decisive milestone. This new facility will allow us to increase our efficiency and capacity, optimize our production flows, and offer both our employees and our customers an environment that matches our ambitions. Our history is here, in La Ferté-Bernard: we were committed to writing its next chapter here. “

Thierry ADAM - Chief Executive Officer of Serac Group.

 

A Project with High Social and Environmental Standards

The future site has been designed to minimize its environmental footprint, with an exterior envelope that complies with the latest applicable standards and a roof designed to accommodate solar panels. The turnkey construction project, entrusted to GSE, will be completed by the end of 2027.